Crew health
vs personal baselineEvent log
Newest firstCrew health
Each value is compared with that crew member's own preflight baseline. Select a row to make them the active crew member for live checks.
Event log
Newest firstHeart rate vs personal baseline
3-day average, SD from own normalCrew twin
Resting heart rate
Shaded band: personal normal range (preflight mean ± 2 SD). Orange points: flagged days.
Bone and muscle loss forecast
% lost since launch. Solid: estimate to date. Dashed with band: forecast under the plan above.
Career radiation dose
mSv, including earlier missions. Dashed line: 600 mSv career limit.
Sleep
Hours per night from overnight camera motion. Dashed line: 7 h target.
Last 14 days as a table
Vitals · camera
Heart rate from ordinary video (remote photoplethysmography, POS method). Click the video to place the box on the forehead.
or run the built-in sample signal.
Heart rate over time
Stabilized value (median of the last 8 good readings) with its range. Dots are raw readings; hollow dots were ignored for poor signal.
Pulse signal
POS output after removing slow drift. Peaks are heartbeats.
Frequency spectrum
The tallest peak in the heart rate band sets the estimate. A sharp, isolated peak means a trustworthy reading.
Voice check
A 15-second check-in compared with the crew member's rested baseline: pitch, variability, speech rate, pauses, jitter and loudness.
Pitch contour
Voice pitch over the clip. A rested voice rises and falls; a fatigued voice tends to go flat.
Alertness test
Psychomotor vigilance test. A counter appears at random moments; respond as fast as possible. Responses over 500 ms count as lapses.
Every response
Reaction time per trial. Responses slower than 500 ms (dashed gray line) count as lapses, a classic sign of fatigue.
Environment
Cabin air and radiation, linked to crew symptoms. CO₂ limit: 3 mmHg one-hour average (NASA-STD-3001).
Cabin CO₂
Daily average, mmHg. Dashed line: 3 mmHg limit. ISS data: headache odds double for each +1 mmHg.
Career radiation by crew member
mSv. Solid: dose to date. Light: projected at day 180 under the current shielding plan. Dashed line: 600 mSv limit.